Zeitungsständer (Symbolbild).
Montag, 11.04.2022 07:30 von | Aufrufe: 82

Excelsior Mining Announces Interim Assay Results from the JCM Infill Drill Program

Zeitungsständer (Symbolbild). © AdrianHancu / iStock Editorial / Getty Images Plus / Getty Images

PR Newswire

PHOENIX, April 11, 2022 /PRNewswire/ - Excelsior Mining Corp. (TSX: MIN) (PFSE: 3XS) (OTCQX: EXMGF) ("Excelsior" or the "Company") is pleased to announce assay results from the infill drill program on the Johnson Camp mine pits (JCM) located in Cochise County, southeastern Arizona.

"The infill drill results from the Burro pit are in-line with existing drilling.  If anything, mineralization appears better and shallower at the north end, but thinning at the south end of the existing pit.  We look forward to getting all the results back, completing the geological and resource interpretations and design optimization, with our goal of restarting of the JCM open pits later this year." Comments Roland Goodgame, Senior Vice President Business Development.

The improved results at the north end of the pit, including the high average leaching potential, should allow the Company to develop a mine plan that targets the high-grade section to maximize cashflows at the start of operations. Permitting of the new leach pad to restart operations is in progress and the Company's goal remains to restart mining operations at JCM later this year.

A total of 31 of the 34 planned holes have been drilled using diamond drill rigs, with 6 holes drilled waiting on assays. Sequential copper assays for approximately 73% of the entire drill program are complete, with the average leaching potential exceeding 60% (excludes intervals that contain sulfide mineralization). Assay highlights are included in Table 1 below. Full assays are included in Table 2.

Table1


 Hole ID


ARIVA.DE Börsen-Geflüster

From (Ft)

To (Ft)

Interval (Ft)

True Thickness (Ft)

TCu%

Type

Avg. Leaching Potential %

EBD-07

2.2

60

57.8

44.3

0.25

O

92%

EBD-07

100

250

150

114.9

0.20

T

41%

EBD-10A

90

340

250

191.5

0.40

T&S

29%

EBD-13

50

210

160

122.6

0.26

T&S

50%

EBD-29

147

280

133

101.9

0.28

T

55%

EBM-04

80

200

120

107.9

0.43

T

40%

EBM-05

6

250

244

200

0.32

O&T

79%

EBM-23

218

520

302

297.5

0.40

O&T

69%

EBM-23

586.5

630

43.5

42.8

0.74

O

92%

EBM-28

148

468

320

309.1

0.38

O&T

55%

EBM-30

6

223

217

Werbung

Mehr Nachrichten zur MFS INTERMEDIATE INCOME TRUST Aktie kostenlos abonnieren

E-Mail-Adresse
Benachrichtigungen von ARIVA.DE
(Mit der Bestellung akzeptierst du die Datenschutzhinweise)

Hinweis: ARIVA.DE veröffentlicht in dieser Rubrik Analysen, Kolumnen und Nachrichten aus verschiedenen Quellen. Die ARIVA.DE AG ist nicht verantwortlich für Inhalte, die erkennbar von Dritten in den „News“-Bereich dieser Webseite eingestellt worden sind, und macht sich diese nicht zu Eigen. Diese Inhalte sind insbesondere durch eine entsprechende „von“-Kennzeichnung unterhalb der Artikelüberschrift und/oder durch den Link „Um den vollständigen Artikel zu lesen, klicken Sie bitte hier.“ erkennbar; verantwortlich für diese Inhalte ist allein der genannte Dritte.