Ein Palladiumbarren.
Dienstag, 28.06.2022 06:00 von | Aufrufe: 74

Clean Air Metals Reports Drill Results including 20.7m grading 3.90 g/t Platinum, 5.36g/t Palladium, 1.97% Copper and 0.97% Nickel in Hole ELR22-143

Ein Palladiumbarren. © claffra / iStock / Getty Images Plus / Getty Images http://www.gettyimages.de

PR Newswire

THUNDER BAY, ON, June 28, 2022 /PRNewswire/ - Clean Air Metals Inc. ("Clean Air Metals" or the "Company") (TSXV: AIR) (FRA: CKU) (OTCQB: CLRMF) is pleased to announce new assay results from the 2022 drill campaign from both the Escape and Current PGE-Cu-Ni Deposits at the Company's Thunder Bay North Project near Thunder Bay, Ontario, Canada (the "Project").

New assay highlights from the Escape South deposit area includes (Table 1):

  • Infill Hole ELR22-140 which intersected 70.5m grading 1.18g/t Platinum (Pt), 1.52g/t Palladium (Pd), 0.54% Copper (Cu) and 0.31% Nickel (Ni) from 341.0m-411.5m downhole, including 14.0m grading 2.65g/t Pt, 3.46 g/t Pd, 1.28% Cu and 0.72% Ni from 392.0-406.0m downhole and increases the known dimensions of the Escape South High Grade Zone ("HGZ").
  • Infill Hole ELR22-143 which intersected 60.0m grading 2.05g/t Platinum (Pt), 2.74g/t Palladium (Pd), 1.01% Copper (Cu) and 0.51% Nickel (Ni) from 373.0m-433.0m downhole including 20.7m grading 3.90 g/t Platinum (Pt), 5.36g/t Palladium (Pd), 1.97% Copper (Cu) and 0.97% Nickel (Ni) from 402.0-422.7.0m downhole (Figure 1) and increases the known dimensions of the Escape South HGZ.

Pursuant to the PEA mine plan reported January 12, 2022, initial production on the Escape Deposit commences at Year 4.5 of the Life of Mine on the Escape South HGZ on 2,323,948 tonnes grading 9.99g/t PtEq insitu. The Escape Deposit has now undergone an additional 55,651m of expansion drilling in 2021 and 2022 not yet included in the project mineral resource.  This additional drilling has established continuity between the Escape South HGZ and the Escape North Zone and may add materially to the total Thunder Bay North Project Indicated insitu mineral resource (effective November 1, 2021) including the Current Deposit, averaging 8.12 g/t PtEq in 14,553,324 million tonnes insitu (reported December 1, 2021).

New assay highlights from the Current deposit area includes (Table 2):

  • Infill Hole CL22-043 which intersected 25.0m grading 2.01g/t Platinum (Pt), 2.57g/t Palladium (Pd), 0.94% Copper (Cu) and 0.52% Nickel (Ni) from 325.7m-373.0m downhole including 8.0m grading 3.08 g/t Platinum (Pt), 2.97g/t Palladium (Pd), 0.63% Copper (Cu) and 0.39% Nickel (Ni) from 147.0-155.0m downhole (Figure 2) and which improves the grade profile of the Beaver Lake Zone down plunge from the main PEA production areas.

Pursuant to the PEA mine plan reported January 12, 2022, the first 3.7 years of mining at Current Deposit on 4,835,410 tonnes of material insitu averages 4.49g/t 4E PGE or 10.04g/t PtEq insitu at Lower Current and Bridge Zones, immediately up plunge from the Beaver Lake Zone.

Mineral resource endowment and platinum-equivalents are quoted pursuant to the Technical Report and Mineral Resource Estimate for the Thunder Bay North Project, Thunder Bay, Ontario, with an effective date of January 20, 2021 (the "Technical Report"). The Technical Report was posted to SEDAR on March 4, 2021 and prepared by Nordmin Engineering Ltd.- QP Glen Kuntz, P.Geo. Ontario. Nordmin as QP utilized 2-year trailing average metal price assumptions[1] for the updated mineral resource as a basis for the Preliminary Economic Assessment (the "PEA") reported on December 1, 2021 and filed January 12, 2022.

DRA Selected as PFS Metallurgical Process Provider

The Company again states that DRA AMERICAS INC ("DRA") is the successful bid under a request for proposal (RFP) for Pre-feasibility Metallurgical Testing and Process Plant Design for the Thunder Bay North Project. The DRA team has reviewed the existing and historical metallurgical testing results and marketing studies culminating in the Preliminary Economic Assessment (PEA) by Nordmin Engineering, the technical report of which was filed on SEDAR on January 12, 2022. DRA will leverage existing knowledge on standard crush, grind, flotation process design and smelter payabilities into the next phase of testing and metallurgical optimization, including amenability to hydrometallurgical recoveries of the main platinum, palladium, copper, nickel commodity suite with rhodium, cobalt, gold and silver byproducts.


ARIVA.DE Börsen-Geflüster

Kurse

71,01 $
-0,45%
AAR Chart
0,036 $
-5,51%
Clean Air Metals Chart
Preliminary Economic Assessment (PEA)

The Company announced a comprehensive mine plan and cashflow model for both the Escape Deposit and Current Deposit as part of a PEA for the Current and Escape PGE-Cu-Ni Deposits of the Thunder Bay North Project on December 1, 2021. The related Technical Report was filed on SEDAR on January 12, 2022 https://cleanairmetals.ca/site/assets/files/5750/21015-01-pfs-0000_ni_43_101_pea_12jan2022.pdf

Table 1: New Insitu Assay Results Update – Escape South Sail-Zone Extension (Figure 1)

Hole ID

Company

From,
m

To, m

Length,
m

Pt+Pd
(ppm)

Cu+Ni
(%)

Pt
(ppm)

Pd
(ppm)

Cu
(%)

Ni
(%)

ELR22-135

AIR

291.8

296

4.2

4.23

0.34

1.95

2.28

0.21

0.13

ELR22-135

AIR

331

337

6.0

1.27

0.47

0.58

0.69

0.24

0.23

ELR22-135

AIR

349

351

2.0

1.09

0.38

0.50

0.59

0.19

0.20

ELR22-135

AIR

355

377

22.0

2.43

0.83

1.09

1.34

0.50

0.33

ELR22-135

AIR

393.2

397

3.8

2.28

0.66

1.05

1.23

0.44

0.21

ELR22-139

AIR

315

317

2.0

1.09

0.41

0.47

0.62

0.22

0.18

ELR22-139

AIR

417

422

5.0

2.49

0.72

1.13

1.36

0.48

0.24

ELR22-140

Werbung

Mehr Nachrichten zur AAR Aktie kostenlos abonnieren

E-Mail-Adresse
Benachrichtigungen von ARIVA.DE
(Mit der Bestellung akzeptierst du die Datenschutzhinweise)

Hinweis: ARIVA.DE veröffentlicht in dieser Rubrik Analysen, Kolumnen und Nachrichten aus verschiedenen Quellen. Die ARIVA.DE AG ist nicht verantwortlich für Inhalte, die erkennbar von Dritten in den „News“-Bereich dieser Webseite eingestellt worden sind, und macht sich diese nicht zu Eigen. Diese Inhalte sind insbesondere durch eine entsprechende „von“-Kennzeichnung unterhalb der Artikelüberschrift und/oder durch den Link „Um den vollständigen Artikel zu lesen, klicken Sie bitte hier.“ erkennbar; verantwortlich für diese Inhalte ist allein der genannte Dritte.


Andere Nutzer interessierten sich auch für folgende News