Ein Mann liest Wirtschaftsnachrichten (Symbolbild).
Freitag, 03.07.2020 17:00 von GlobeNewswire | Aufrufe: 2725

Norsk Hydro: Production resumed at Paragominas and Alunorte

Ein Mann liest Wirtschaftsnachrichten (Symbolbild). pixabay.com

The power supply to Hydro’s Paragominas bauxite mine, in the state of Pará in northern Brazil, has been restored, allowing production to restart. As a result, production is being ramped up at Hydro’s Alunorte alumina refinery. 

On June 20, three power transmission towers overturned, cutting the power supply to the mine and temporarily halting production. The transmission towers have been repaired, and the power has been restored. There were no personnel injuries, damage to other production assets or impact on the nearby environment related to the power outage. 

The company is cooperating with local authorities to determine the cause of the incident. Preliminary findings indicate that parts were stolen from the towers causing them to overturn. 

Investor contact:   
Line Haugetraa  
+47 41406376  
Line.Haugetraa@hydro.com  

Media contact: 
Anders Vindegg
+47 93864271
Anders.Vindegg@hydro.com 


ARIVA.DE Börsen-Geflüster

Werbung

Mehr Nachrichten zur Anleihe kostenlos abonnieren

E-Mail-Adresse
Benachrichtigungen von ARIVA.DE
(Mit der Bestellung akzeptierst du die Datenschutzhinweise)

Hinweis: ARIVA.DE veröffentlicht in dieser Rubrik Analysen, Kolumnen und Nachrichten aus verschiedenen Quellen. Die ARIVA.DE AG ist nicht verantwortlich für Inhalte, die erkennbar von Dritten in den „News“-Bereich dieser Webseite eingestellt worden sind, und macht sich diese nicht zu Eigen. Diese Inhalte sind insbesondere durch eine entsprechende „von“-Kennzeichnung unterhalb der Artikelüberschrift und/oder durch den Link „Um den vollständigen Artikel zu lesen, klicken Sie bitte hier.“ erkennbar; verantwortlich für diese Inhalte ist allein der genannte Dritte.


Andere Nutzer interessierten sich auch für folgende News