Darum geht es - diese Genehmigung scheint noch zu fehlen, bevor es losgehen kann:
Instrument Proposal Notice: EBR Registry Number: 010-4672
Proponent: VG Gold Corp. 65 Queen Street West Suite 520 Toronto Ontario Canada M5H 2M5
Instrument Type: Approval for sewage works -
OWRA s. 53(1) Ministry Reference Number: 4725-7FRKKC Ministry: Ministry of the Environment Date Proposal loaded to the Registry: September 18, 2008
Keyword(s): Mining
The comment period for this proposal is now over.
Description of Instrument: This proposal is for a Certificate of Approval for Industrial Sewage Works for the Davidson Tisdale mine situated 3 kilometres north west of Government Road in South Porcupine, within the boundaries of the City of Timmins, Ontario. Mining methods will include both an underground mine that will be accessed by a ramp to surface and a small pit operation that will be located in the vicinity of shaft number One. There will be no concentrating on-site. Gold ore will be hauled off-site to a local gold mill. Mine groundwater will be pumped into a surface settling pond that will overflow into a storm water settling pond before draining into the environment. Effluent limits for arsenic, copper, lead, nickel, zinc, aluminum, total ammonia nitrogen and total suspended solids will be imposed.
Public Consultation: This proposal was posted for a 30 day public review and comment period starting September 18, 2008. Comments were to be received by October 18, 2008. All comments received during the comment period are being considered as part of the decision-making process by the Ministry of the Environment. Please Note: All comments and submissions received have become part of the public record.
Der Antrag liegt nun seit über 9 Monaten bei der Antragsstelle. Und da ärgern sich manche Leute über zu lange Bearbeitungszeiten in Deutschland....