war noch zu frueh am morgen.
|
As a total solar energy solution provider, Conergy Canada is previewing a full portfolio of Conergy-designed, Feed-in Tariff (FiT)-compliant mounting systems at CanSIA Solar Canada Conference (booth 602) on 5-6 December 2011 in Toronto, Canada.
The mounting system portfolio includes complete solutions for every type of photovoltaic (PV) installation: SunTop IV and a preview of SunTop Trapez for pitched roof; SunTop tilt units for flat roofs and a new aerodynamic solution for weight-limited flat roofs; Solar Giant, a ballasted ground-mount solution; and SolarLinea, a driven-pile mounting system for free field. With 18 years of mounting systems experience, 1 gigawatt (GW) of mounting systems sold and the combined expertise of project developers, wholesalers and installers, Conergy developed its mounting system portfolio to solve solar installation challenges faced in the real world.
Conergy will unveil its lightweight, limited ballast commercial roof mounting system to the Canadian market at the conference. Designed by an aeronautical engineer, the SolarFamulus Air leverages aerodynamic forces to decrease ballasting and eliminate roof penetration, therefore enabling installation on rooftops that currently can't support a solar array.
In order to decrease installation time and costs, Conergy's entire mounting system portfolio arrives with extensively preassembled parts and prefabricated components to eliminate the need for drilling and cutting in the field. Its mounting system portfolio is designed to simplify logistics and improve design flexibility. The patented QuickStone technology that is used across the portfolio simplifies and speeds installation while reducing shipping and inventory complexities. For example, the same 6-millimetre Allen Wrench is the main tool needed for installation for the entire portfolio. The flexible design and use of components that do not require expensive equipment for installation decrease or even eliminate expensive preparation work and site modifications.
Conergy mounting systems are manufactured in Ontario, Canada to meet Ontario Power Authority local content requirements for FiT eligibility. Conergy's mounting systems services include custom engineering, design assistance and technical support from its technicians and engineers.
"Der Ausstieg aus den AKW’s und gleichzeitiger breiter Umstieg in die EE, findet definitiv in Praxis nicht statt."
Kannst Du Deine Aussage belegen?
http://www.bmu.de/pressemitteilungen/...essemitteilungen/pm/47955.php
|
Wertung | Antworten | Thema | Verfasser | letzter Verfasser | letzter Beitrag | |
131 | 53.908 | Conergy, wie Phönix aus der Asche ? | Ananas | michelangelo321 | 22.04.24 20:26 | |
9 | CONERGY AG ein erstes Solarunternehmen , | michelangelo321 | michelangelo321 | 04.01.24 22:45 | ||
54 | 13.406 | Conergy, Pro und Contra... | extrachili | extrachili | 01.09.23 10:17 | |
7 | Energiegipfel | sparbuch | sparbuch | 25.04.21 13:17 | ||
5 | 623 | Conergy Insolvenz-Thread | Börsenfan | extrachili | 25.04.21 01:05 |