BCM Resources Corporation: Additional Results From Hole 27 YieldHigh-Grade Interval of 0.189% Molybdenum Over 17.34m

Freitag, 15.06.2007 06:35 von

VANCOUVER, BRITISH COLUMBIA -- (MARKET WIRE) -- June 15, 2007 -- BCM Resources Corporation (TSX VENTURE: B) - Additional assay results have identified a high-grade molybdenum interval at the bottom of Hole 27 (from 407.25m to 424.59m) of the Shan drill program. The hole was terminated in high-grade ore. Hole 27 ended in what appears to be mineralization of a pre-ore fault zone. The highly mineralized nature of the fault zone was not recognized at the time due to abundant grey fault gouge and brecciation. The following table details the significant higher grade intercepts in Hole 27: ----------------------------------------------------------- Table of Intercepts ----------------------------------------------------------- Hole From To Width (m) Grade % Mo ----------------------------------------------------------- LM027(i) 111.8 302.4 190.6 0.103 ----------------------------------------------------------- including 111.8 217.5 105.7 0.119 ----------------------------------------------------------- including 190.6 217.5 26.87 0.168 ----------------------------------------------------------- including 268.8 272.3 3.45 0.247 ----------------------------------------------------------- including 288.0 302.4 14.5 0.362 ----------------------------------------------------------- New Interval 407.3 424.6 17.3 0.189 ----------------------------------------------------------- (i) Previously reported ----------------------------------------------------------- All assays reported in this release were carried out at Acme Analytical Laboratories in Vancouver, B.C. Standards, blanks and duplicate samples were systematically submitted to the lab for QA/QC. Qualified Person Daryl Hanson, P.Eng., a Qualified Person as defined in NI 43-01, has reviewed the technical content of the drill program and previously reported results but not this news release. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release. Contacts: BCM Resources Corporation Dale McClanaghan President & CEO (604) 646-0144 Website: www.bcmresources.com

Weitere Themen